Guest House & ADU Builder Keller TX — DFW ADU Pro®

Keller, TX · Tarrant County

ADU Contractor in Keller, TX

Keller's Premier Guest House & ADU Builder — Permits, Design & Construction

Keller is one of the most sought-after addresses in Tarrant County — and its generous lot sizes, strong school district, and proximity to the Alliance corridor make it one of the best markets in DFW for a backyard guest house or in-law suite. DFW ADU Pro® has built ADUs throughout Keller's established neighborhoods, from Bear Creek and Hidden Lakes to Keller Crossing and Stone Creek Ranch. We handle every step: zoning research, feasibility assessment, design, permit applications, and full construction — so you never have to deal with city hall on your own.

5.0 · 100+ Custom ADU Reviews
ADU built by DFW ADU Pro in Keller, Texas
Keller ADU Specialists
Serving Keller & surrounding areas · Tarrant County

ADU Types We Build in Keller

Every ADU type, fully permitted and built to Keller code.

$125,000 – $185,000

Detached Studio / 1-Bed Guest House

The most popular choice for Keller lots. A fully independent backyard structure ideal for rental income, an aging parent, or a returning adult child. Architecturally matched to your primary home.

$195,000 – $275,000

2-Bedroom Detached ADU

Maximizes rental income on larger Keller lots (10,000+ sq ft). Commands strong rents near Keller ISD schools and the Alliance employment corridor.

$75,000 – $130,000

Garage Conversion ADU

Convert your attached or detached garage into a fully permitted living space. Typically the fastest permit pathway in Keller and the lowest-cost way to add a rentable unit.

$60,000 – $110,000

Junior ADU (JADU)

Interior conversion of existing space within your primary residence — a bonus room, oversized master suite, or finished basement area. No new footprint, minimal permitting complexity.

Why Keller Homeowners Choose DFW ADU Pro®

  • Familiar with Keller zoning codes, lot coverage rules, and the Development Services process
  • Experience navigating Keller's Specific Use Permit pathway for ADUs where required
  • In-house design, permitting, and construction — one team, no subcontracted handoffs
  • Financing assistance through trusted DFW lending partners including First United Bank
  • Licensed and fully insured in Texas
  • 25+ years of construction experience in the DFW Metroplex
  • Dedicated project manager from feasibility assessment to Certificate of Occupancy

Keller ADU Rental Income

A Keller ADU can generate monthly rental income while potentially boosting your property value. The figures below are illustrative estimates based on general market data — actual results vary by unit size, condition, location, and market demand. Consult a licensed appraiser and current local rental listings before making financial decisions.

Studio ADU$1,100 – $1,600/mo
1-Bedroom ADU$1,400 – $2,000/mo
2-Bedroom ADU$1,800 – $2,600/mo
Avg. Annual Income$16,800 – $28,800/yr (est.)
Get Free Estimate

Keller ADU FAQs

Are ADUs allowed in Keller, TX?

ADUs are permitted in Keller's single-family residential zones, but the approval pathway depends on your specific zoning district. Some Keller properties require a Specific Use Permit (SUP) rather than a standard building permit — a process that involves a public hearing and Planning & Zoning Commission review rather than an over-the-counter approval. Requirements vary by lot, zoning district, and HOA. DFW ADU Pro® verifies the applicable rules during your free property-feasibility assessment before any design work begins.

What are the setback requirements for ADUs in Keller?

Setback requirements in Keller vary by zoning district and lot configuration. As a general reference, detached ADUs in many Keller residential zones require rear setbacks of 5–10 feet and side setbacks of 5 feet — but your specific lot may differ. We conduct a full property feasibility assessment before design begins to confirm your lot's exact requirements.

How long does it take to get an ADU permit in Keller?

For a standard building permit, Keller's plan review typically runs 3–6 weeks. If your property requires a Specific Use Permit, the timeline is longer and less predictable — SUP applications go through a public notice period and Planning & Zoning Commission hearing before a decision is issued. Total project timeline from consultation to Certificate of Occupancy is typically 6–9 months for a standard permit pathway, and longer for an SUP. We'll give you a realistic timeline estimate after reviewing your property.

Can I rent out my ADU in Keller?

Yes. Keller ADUs can be rented to long-term tenants. Rental estimates for Keller range from approximately $1,100–$2,600/month depending on size, finishes, and proximity to Keller ISD schools and the Alliance corridor. These are illustrative estimates — actual rents vary. If you're considering short-term rentals (Airbnb, VRBO), verify Keller's current STR licensing requirements and any applicable HOA restrictions before proceeding.

Can my HOA restrict an ADU in Keller?

Yes. Many Keller neighborhoods — including Bear Creek, Hidden Lakes, and Stone Creek Ranch — have active HOA covenants that may restrict or require architectural review for ADUs. HOA approval is entirely separate from city permitting and must be obtained before construction begins. We review your HOA documents during the feasibility assessment and help you navigate the architectural review process.

Do I need to live on the property to build an ADU in Keller?

Owner-occupancy requirements vary by zoning district and are subject to change. We verify current Keller ordinance requirements during your free feasibility assessment before any design work begins.

Keller is part of our Tarrant County service area.

Ready to Build Your Keller ADU?

Get a free, no-obligation estimate from Keller's most trusted ADU contractor.